Iron Smelt Vinderheima 2006
Date: 5 November, 2006
Location: Vinderheima
Premise: Explore an interesting result
from Early Iron 3 - that ore can be added very much faster than we have
done in the past.
Experiment Notes - Norse Short Shaft Smelter
The Team:
| Leader |
Darrell Markewitz |
| Staff |
Kevin Jarbeau Ken Cook Darrell Markewitz |
| Recorder |
Darrell Markewitz Neil Peterson |
 |
Reports of all of our iron smelting efforts along with more articles and information are available on the "Iron Smelting in the Viking Age" CD from the Wareham Forge. Copies of the CD can be purchased here. |
Smelt Totals
| Total Charcoal |
42 lb (19 Kg) |
Weight of Bloom |
|
Total Elapsed Time: |
2:48 to last charcoal added |
| Total Ore |
47 lb (21 Kg) |
Weight of Slag: |
|
Bloom Quality |
|
Discussion:
This smelt simply re-used the existing smelter, patched it in
minor ways, and did a new smelt. The difference being a
planned ratio of nearly 1:1 ore/charcoal.
It didn't work.
Some of the problems.
- We changed charcoal. We had run out of the Royal
Oak so we tried some from a different supplier. This charcoal
was considerably drier and hence lighter. We didn't discover
until the end that the 4lb bucket we were using weighed (with the new
charcoal) more like 2-2.5 lbs. This meant that we were adding
3.25lbs of ore to 2ish lbs of charcoal instead of the planned 4lbs of
charcoal. This meant that the ore wasn't being heated as much.
- The base was not set up with fines to position the bloom in
the right spot (this is believed to be the cause of the failure - and
was confirmed by Darrell repeating the smelt the next day with this
fixed - that smelt worked.) The base was allowed to establish itself
from the collected wood ash from the pre-heat, plus addtiional
charcoal. This resulted in the slag bowl forming significantly lower
than what had been seen in the past. (roughly 10 plus cm below the
bottom of the tuyere.)
- The ore scoops weren't the 0.75 lbs we were used to - they
were more like 0.9lbs. We are going to have to get into the
habit of re-calibrating at EVERY smelt to allow for variablility in raw
materials.
Fun none the less and a lovely day for a smelt.
Our images didn't turn out well due to a small technical glitch but
here are four interesting shots.
 |
 |
 |
 |
| Smelter with extension |
Burning |
Burndown |
Slag |
And four more attempts at a "down the pipe" shot. These shots
are taken down the tuyure through the clear cap on the end. I
am currently using a manual focus 200mm lense with two ND0.6 filters to
decrease the light level. Even at 200mm the portions below occupy
a space less than 2" square on the 4x6 print. The apature is
around f11, the internal light meter is suggesting around a 1/30 second
exposure. These are actually shot at 1/1000th and are still a
little saturated. Next time I want to pre-focus the camera at
a target inside the smelter before the pre-heat. My camera guy is
also looking for a lense adapter which will jump the lense to a 400mm
and knock of two more stops to allow me more freedom in choosing
exposures. Should be fun....
 |
 |
 |
 |
| Burning charcoal |
Blockage |
Down the pipe |
Down the pipe |
| ELAPSED; |
COMPARE |
EVENT |
ORE |
CHARCOAL |
AIR |
ADD (scoops) (410 g) |
AMOUNT (Kg) |
TOTAL (Kg) |
COMPARE (LB) |
TOTAL (1 Kg each) |
COMPARE (LB) |
SETTING |
VOLUME (litre/min) |
| |
|
start preheat |
|
|
|
|
|
|
|
|
| 40 |
|
addtion of rough carcoal |
|
|
|
|
|
|
B |
700 |
| 10 |
|
|
|
|
|
|
|
|
D |
1060 |
| 5 |
|
start graded fuel |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
| 0 |
|
|
|
|
|
|
1 |
|
|
|
| 4 |
|
|
|
|
|
|
2 |
|
|
|
| 6 |
|
|
|
|
|
|
3 |
|
|
|
| 7 |
|
|
|
|
|
|
4 |
|
|
|
| 5 |
|
burn column to top of clay |
|
|
|
|
5 |
|
|
|
| 8 |
|
start of ore charges |
5 |
2 |
2 |
|
6 |
|
|
|
| 7 |
15 |
|
5 |
2 |
4 |
8.8 |
7 |
4.4 |
|
|
| 7 |
|
|
5 |
2 |
6 |
|
8 |
|
|
|
| 4 |
11 |
|
5 |
2 |
8 |
8.8 |
9 |
4.4 |
|
|
| 8 |
|
|
5 |
2 |
10 |
|
10 |
|
|
|
| 5 |
13 |
first ore hits tuyere? |
5 |
2 |
12 |
8.8 |
11 |
4.4 |
|
|
| 7 |
|
rod tuyere |
5 |
2 |
14 |
|
12 |
|
|
|
| 6 |
13 |
|
5 |
2 |
16 |
8.8 |
13 |
4.4 |
|
|
| 7 |
|
|
6 |
2 |
18 |
|
14 |
|
|
|
| 5 |
12 |
|
6 |
2 |
20 |
8.8 |
15 |
4.4 |
|
|
| 6 |
|
last ore charges |
2 |
0.8 |
20.8 |
|
16 |
|
|
|
| 6 |
|
|
|
|
|
|
17 |
|
|
|
| 8 |
|
|
|
|
|
|
18 |
|
|
|
| 7 |
|
start burn down |
|
|
|
|
19 |
|
|
|
| 31 |
|
start emptying furnace |
|
|
|
|
|
|
B |
700 |
| |
|
TOTALS |
LBS |
|
47 |
|
42 |
|
|
|
| |
|
|
KG |
|
21.00 |
|
19.00 |
|
|
|
 |
Reports of all of our iron smelting efforts along with more articles and information are available on the "Iron Smelting in the Viking Age" CD from the Wareham Forge. Copies of the CD can be purchased here. |